Sealed shell
Insulated panels and sealed joints keep heat, dust and water out.
Building type · Data center
Steel shells for edge and enterprise data centres: a sealed, insulated envelope, a roof designed to carry cable trays, ducts and fire lines, and a programme fast enough to keep pace with IT demand.
Design it yourself
Open any of these in our free 3D designer, change the size, roof, doors and colours, and get a design sheet with a budget quotation in minutes.
Small sealed hall near users
Rack hall with plant mezzanine
Large multi-span hall
Overview
A data centre shell has a simple brief and strict details: keep the weather out, keep the heat and dust out, and carry a dense web of services. We build data centre and edge data centre shells on a pre-engineered steel frame with insulated panels on the roof and walls and no skylights or ventilators, so the envelope stays sealed.
The roof is designed for the services that hang from it: cable trays, chilled-water and fire lines, ducts and containment, with a collateral load of at least 0.5 kN/m². Equipment doors are framed for the racks, UPS and switchgear that need to come in.
Steel is quick to erect, so the shell is ready for the fit-out teams sooner, and further halls can be added along the same grid as capacity grows.
Why pre-engineered
What a pre-engineered steel frame gives a data center owner.
Insulated panels and sealed joints keep heat, dust and water out.
Cable trays, pipes and ducts are designed into the roof load.
Steel shells close in quickly so the IT fit-out starts earlier.
Extend along the grid as racks and power grow.
Clear spans leave the hall free for rack rows and containment.
A light steel shell puts more of the budget into the IT and cooling.
Engineering
How it works
The building in the background goes up in the same order as you scroll.
Set the size, roof, openings and colours in our designer and send it for a quotation.
Our engineers design every member to IS 800 and IS 875 for your site and issue the drawings.
Columns, rafters and purlins made to measure in the plant, painted and marked.
Our crews erect the frames, bracing and sheeting bay by bay.
Final checks, quality records and the keys to your data center.
FAQ
Short answers to what owners ask. For your exact building, design it in 3D or call us.
Yes. Many edge and enterprise data centres use a steel shell with insulated panels. The shell is quick to build and the clear span suits rack rows and containment.
Our designer uses at least 0.5 kN/m² of collateral load for cable trays, pipes and ducts. Heavier services or roof plant are added from your MEP design.
A data hall needs a sealed, controlled envelope. Daylight and natural ventilation would let in heat, dust and moisture.
No. We build the shell and coordinate openings, supports and levels with your MEP and IT contractors.
Yes. Start from the data center preset in our 3D designer, set the size and doors, and download a design sheet and budget.
Insights
Design, fabrication, material certificates, coating, erection crews, safety, drawings and payment terms: what to verify about a pre-engineered building company before you award the work.
Read articleDesign, fabrication, material certificates, coating, erection crews, safety, drawings and payment terms: what to verify about a pre-engineered building company before you award the work.
Read articleOther buildings
PEB cold storage buildings with insulated PUF sandwich panels for fruit, vegetables, dairy and pharma. Design your cold storage shed in 3D and get a budget quote.
Explore cold storage Building type · FactoryPre-engineered factory buildings and industrial sheds with EOT cranes from 3 to 20 t, mezzanines and offices. Design your factory shed in 3D and get a budget quote.
Explore factory with crane Building type · WarehousePre-engineered steel warehouses and godowns with clear spans up to 60 m for racking, docks and logistics. Design your PEB warehouse in 3D for a budget quote.
Explore warehouseFree 3D designer
Design it on screen, download the design sheet, and get a budget quotation from our engineers. No drawings needed to start.