Erection & management

Trained crews raise, plumb and bolt every frame, while one project manager holds your time, cost, quality and safety targets from mobilisation to handover.

Scroll to watch it go up

Overview

One manager, one programme

Most site delays come from gaps between contractors. We close them by running the whole site ourselves.

Before anyone lifts a member, we plan the job: crane positions, access routes, laydown areas and the sequence in which bays go up. You get a written programme and a single person who answers for it.

Erection begins with a braced bay, two frames tied together to make a stable box. Columns, rafters, purlins and bracing follow bay by bay. Each frame is checked for plumb and alignment and its bolts are tightened before the crew moves on.

Sheeting, gutters, ventilators, doors and trims close the building in. Throughout, you receive progress updates with photos, so you always know where the job stands.

Scope

Everything between truck and keys

Erection is a sequence of controlled lifts. Here is what our site teams take on.

01 / Planning

Project planning

Programme, lifting plans, laydown layout and coordination with civil and other trades.

02 / Mobilise

Cranes & equipment

Mobile cranes, man-lifts, scaffolding and calibrated tools sized to your structure.

03 / Primary

Frame erection

Columns and rafters raised from the braced bay outward, connected and temporarily guyed.

04 / Secondary

Purlins, girts & bracing

Secondary steel fixed and bracing tensioned to lock the frames into a stable structure.

05 / Envelope

Sheeting & finishing

Roof and wall sheets, insulation, gutters, ventilators, skylights, flashings and doors.

06 / Safety

Safety & quality

Harnesses and lifelines, toolbox talks, lift supervision and frame-by-frame checks.

How it runs

How a site runs

The building in the background follows the same order as you scroll.

01

Plan

Programme, lift plans and laydown areas agreed with you.

02

Mobilise

Crew, cranes and tools arrive; material is checked and stacked.

03

Erect frames

Braced bay first, then frames, purlins and bracing, bay by bay.

04

Sheet & finish

Roof and walls closed in, accessories and doors fitted.

05

Hand over

Final alignment, bolt checks, snag list and handover walk.

Standards & quality

Safe lifts, true frames

Lift plansEvery major lift planned for crane capacity, radius and ground.
Fall protectionHarnesses, lifelines and safety nets wherever crews work at height.
AlignmentEach frame checked for plumb and line before the next goes up.
Bolt checksHigh-strength bolts tightened and marked as each bay is completed.

FAQ

Common questions

Short answers to what owners ask about this service. Anything else, ask us directly.

Yes, as long as we receive the erection drawings and the material is complete and marked. We check the delivery against the dispatch list before work begins.

Cured foundations with anchor bolts checked against the drawing, firm access for trucks and cranes, a level laydown area, and power and water for the site office.

Lifts are planned in advance, crews wear harnesses and work on lifelines at height, and every shift starts with a toolbox talk. Unsafe weather stops lifting.

Your project manager sends daily updates with photos and a weekly look-ahead against the programme, so delays are flagged early.

Other services

One team, every stage

Start a project

Ready to raise yours?

Send your plot size, location and use. An engineer will reply with a frame proposal and a budget range.

Get a quote Talk to an engineer Call the office79747 10028