Service 03 · Ground

Civil work, built true

A building is only as strong as the ground it stands on. Our civil teams set out, excavate and cast the foundations your steel frame depends on.

Scroll to set the foundations

Overview

Foundations the frame can trust

Most erection problems start in the ground. We remove them by doing the civil work and the steel work as one team.

A steel frame lands on anchor bolts cast into concrete pedestals. If those bolts are a few millimetres out, base plates will not fit and erection stops. That is why we set every bolt group with steel templates and check line and level before each pour.

Our civil teams handle the full scope: setting out, excavation, footings, pedestals, plinth beams, filling and compaction, grade slabs and industrial flooring, followed by masonry, plaster, drainage and external works.

Because the same company erects the steel, foundation drawings, bolt layouts and casting schedules are coordinated from day one. When the concrete has cured, the frames are ready to go up.

Scope

Below the steel

Everything the frame stands on, and everything around it once it is up.

01 / Setting out

Survey & setting out

Grid lines, levels and column positions marked to the foundation drawing.

02 / Earthwork

Excavation

Excavation to design depth, PCC bedding and shoring where the soil needs it.

03 / Foundations

Footings & pedestals

Reinforced footings and pedestals with anchor bolts held true by steel templates.

04 / Plinth

Plinth & grade slab

Plinth beams, filling, compaction and the slab that carries your floor loads.

05 / Flooring

Industrial flooring

Trimix or VDF floors with hardeners for racking, forklifts and machinery.

06 / Finishing

Masonry & external works

Brick or block walls, plaster, drainage, paving and approach roads.

How it runs

Ground to grade

The building in the background shows only the foundations. That is the whole job of this stage.

01

Survey

Grid, levels and column positions set out on the ground.

02

Excavate

Pits dug to depth and bedded with lean concrete.

03

Cast

Footings and pedestals poured with anchor bolts on templates.

04

Plinth & floor

Plinth beams, filling, compaction and the floor slab.

05

Finish

Masonry, plaster, drainage and external works.

Standards & quality

Checked before every pour

IS 456Plain and reinforced concrete: design and workmanship.
TemplatesSteel templates hold anchor bolts true during the pour.
Cube testsConcrete samples cast and tested to confirm strength.
Line & levelBolt groups checked for line, level and projection before pouring.

FAQ

Common questions

Short answers to what owners ask about this service. Anything else, ask us directly.

For most industrial buildings, yes. A soil investigation tells the designer how much load the ground can carry, which sets footing sizes. We can arrange one through a testing agency if you do not have a report.

Column base plates are drilled in the factory. If the bolts in the concrete are out of position, plates will not fit, and fixing it on site costs time and weakens the connection.

Yes. We take civil-only contracts, including foundations for steel supplied by others, as long as we have the foundation and anchor bolt drawings.

It depends on use. Trimix or VDF floors with a surface hardener suit warehouses and factories with forklift traffic. We recommend thickness and finish based on your loads.

Other services

One team, every stage

Start a project

Ready to raise yours?

Send your plot size, location and use. An engineer will reply with a frame proposal and a budget range.

Get a quote Talk to an engineer Call the office79747 10028