01Start & size
Pick a starting point, then set the footprint. Every change updates the building live.
Structural system
Conventional steel: roof trusses of angles or pipes on hot-rolled ISMB columns, channel purlins and girts, designed to IS 800 and IS 875. Choose the truss in step 2.
We follow the operator's site specification for dispatch bays, cold room, power and signage. Brand names belong to their owners; Best PEB is not affiliated with them.
Width, length and bays are
Centre to centre: width between the column centres, length and bays between the frame centre lines, as on a civil grid. We work out the out-to-out size from the designed columns and show both.
Bay spacing
End-wall column spacing
02Frame & roof
The roof profile, how the frame spans, and what the roof is made of.
Roof type
Roof slope
Frame type
Truss type
Truss members
Columns
Purlins & girts
Sheeting
Vent position
03Walls
How closed the building is, and what the walls are built from.
Enclosure
Brick wall on each wall
Leave a wall blank to use the height above. Windows sit in the brick wall only, so a wall with windows has its brick raised to the window head plus 300 mm for the lintel.
Open end walls
Panel widths from the left corner, seen from outside, for example 5, 5, 5.5. Leave empty for about 7 m. Gable end columns carry the end rafter, so the end frames are lighter; the outer panels take X-bracing and the panels between them stay clear. Rigid frames keep the whole end clear at a higher steel weight.
Open sides keep only the roof and gable ends. Ideal for parking, dairy, storage yards and assembly areas.
Side cladding sheets
Road direction
Across: side to side through every bay over 9 m. Along: end to end through the gable ends, down the middle of each span (in and back out where one end stands against an existing building). Both: the two together.
Road across comes in from
One side only: the road stops at the shed. Trucks drive in from that side, unload and reverse out.
Road along comes in from
Gutters & downtake pipes
Eave gutters on each low eave with a 100 x 75 downtake pipe down the frame columns, at every frame or at alternate frames. No gutters: an eave drip trim, and the roof water falls clear of the eave (keep a drain along both sides).
Sheeted walls
04Doors & openings
Choose a wall, then add rolling shutters, doors and windows with their own sizes. Drag any of them along its wall in the 3D view to place it.
An open-sided shed has no shutters, doors or windows to set. Canopies can still be added below: on an open shed they sit just under the eave and extend the roof cover, or just under the side cladding sheets when the shed has them.
05Add-ons
Extra covered space, an upper floor, and lifting equipment.
EOT crane
Existing building next to it
Pick every side that has an existing building: tap a side again to remove it.
Settings for
Each existing building has its own type, height, depth and connection. Pick a side, then set it below.
Existing building is
Connection
For stability the new building always stands on its own: its own footings, its own bracing in every wall, and the existing building carries none of its weight. Independent (recommended): an expansion gap sized to the sideways movement of both buildings under wind and earthquake (at least 50 mm, more for a steel shed), closed by a sealed flashing, so they never knock together. Tied: the steel columns on that wall are also propped by the existing columns at its top level, with chemical anchors into RCC or bolts through a steel column; each tie is designed for the full sideways load of its frame, and the existing building must be checked by its engineer to take it. Rests on it, no columns (front or rear wall, PEB, no crane, existing building no more than 3 m below the eave): that end has no columns or footings; the end rafter sits on bearing brackets on the existing columns, and where the roof is higher than the existing building, short gable posts stand on it to carry the gable girts and sheeting. The rest of the building keeps its own frames and bracing, so it stays stable, and the existing building takes only the vertical load of that end. That wall gets no sheeting, openings or canopy below the existing building's height.
06Colours & check
Colour-coated sheet shades from standard mill ranges. Then review the engineer notes.
Engineer notes