Seven questions to answer before you ask for a quote
The fastest way to get an accurate, comparable PEB quote is to answer a few questions before you call anyone. Each one changes the steel weight, and with it the price.
1. What will the building be used for?
Storage, manufacturing, cold storage and workshops carry different loads and services (see our pages on warehouses, factories, cold storage and dark stores). Mention cranes, hoists, racking that ties into the frame, and any equipment hung from the roof. A 5-tonne crane changes column and rafter sizes significantly.
2. How big, and on what plot?
Give the length and width you need, plus the plot boundaries and setbacks. Builders can then suggest an efficient span and bay spacing rather than forcing a size that wastes steel.
3. What clear height do you need?
Clear height is the usable height under the lowest part of the roof structure. Base it on your tallest racking, machinery or truck, plus clearance. Every extra metre adds steel and cladding, so choose deliberately.
4. Where exactly is the site?
Wind speed and earthquake zone vary across India and are set by IS 875 Part 3 and IS 1893. A coastal or hilltop site needs a stronger frame than a sheltered inland one. Soil conditions also shape the foundations, so share a soil report if you have one.
5. Which roof and wall finish?
Single-skin galvalume sheeting is the most economical. Add underdeck insulation or PUF sandwich panels for comfort or temperature control. Say whether walls should be sheeted to the ground or built in masonry up to a dado height.
6. Openings, light and ventilation
List roller shutters, personnel doors, windows, translucent sheets and ventilators with their sizes. Openings affect framing and bracing, so late additions often mean redesign.
7. Will you expand later?
If the business may grow, say so now. An expandable end wall costs little at the start and saves a great deal when new bays are added.
How to compare two PEB quotes
- Steel weight and loads. A much lighter quote may be designed for lower roof loads, a lower wind speed or no collateral load for services. Ask for the design loads in writing.
- Member sizes. Compare frame, purlin and girt sections, and the sheet thickness (for example 0.50 mm TCT).
- Rate per kg and per square metre. Look at both: a low rate per kg on a heavy design can still cost more.
- Deflection limits and codes. Check that the design follows IS 800 and IS 875 for your site.
Bonus: what is in scope?
Ask every bidder to state clearly whether civil work, freight, erection, cranes, taxes and accessories are included. That is the only way to compare quotes fairly.
Answer all seven in minutes
Our free 3D designer walks you through these questions one step at a time: use, size, clear height, site, roof and walls, openings and add-ons. When you finish, you get a design sheet and a budget quotation built from the actual bill of materials, and our engineers follow up with a frame proposal.
Questions owners ask
What information do I need for a PEB quotation?
The use, length and width, clear height, site location, roof and wall finish, openings, and any crane, mezzanine or future expansion.
Why do PEB quotes differ so much?
Mostly because of different design loads, wind speeds, member sizes and scope. Compare the loads, the steel weight and what is included, not only the rate per kg.
Can I get a quick budget online?
Yes. Design your building in our 3D designer and you receive a design sheet with a budget quotation based on the actual steel weight.